Clarification on the architectural wall in substructure of BRAC University new campus project
This record consists of general correspondence regarding clarification on the architectural wall in substructure of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20664 |
Registos relacionados
-
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
Por: BUCG-ABC Joint Venture
Publicado em: (2023) -
Clarification on quotation and submission of BOQ without price for facade curtain, window, vertical louver works of BRAC University new campus project
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Clarification meeting regarding design issues of BRAC University new campus project
Por: BUCG
Publicado em: (2023)