Clarification on the architectural wall in substructure of BRAC University new campus project
This record consists of general correspondence regarding clarification on the architectural wall in substructure of BRAC University new campus project.
Հիմնական հեղինակ: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Ձևաչափ: | General correspondence |
Լեզու: | English |
Հրապարակվել է: |
Brac University
2023
|
Խորագրեր: | |
Առցանց հասանելիություն: | http://hdl.handle.net/10361/20664 |
Նմանատիպ նյութեր
-
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
: BUCG-ABC Joint Venture (BUCG-ABC JV)
Հրապարակվել է: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
: BUCG-ABC Joint Venture
Հրապարակվել է: (2023) -
Clarification on quotation and submission of BOQ without price for facade curtain, window, vertical louver works of BRAC University new campus project
: BUCG-ABC Joint Venture (BUCG-ABC JV)
Հրապարակվել է: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
: BUCG-ABC Joint Venture (BUCG-ABC JV)
Հրապարակվել է: (2023) -
Clarification meeting regarding design issues of BRAC University new campus project
: BUCG
Հրապարակվել է: (2023)