Clarification on the architectural wall in substructure of BRAC University new campus project
This record consists of general correspondence regarding clarification on the architectural wall in substructure of BRAC University new campus project.
मुख्य लेखक: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20664 |
समान संसाधन
-
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture
प्रकाशित: (2023) -
Clarification on quotation and submission of BOQ without price for facade curtain, window, vertical louver works of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Clarification meeting regarding design issues of BRAC University new campus project
द्वारा: BUCG
प्रकाशित: (2023)