Clarification on the architectural wall in substructure of BRAC University new campus project
This record consists of general correspondence regarding clarification on the architectural wall in substructure of BRAC University new campus project.
מחבר ראשי: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
פורמט: | General correspondence |
שפה: | English |
יצא לאור: |
Brac University
2023
|
נושאים: | |
גישה מקוונת: | http://hdl.handle.net/10361/20664 |
פריטים דומים
-
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
מאת: BUCG-ABC Joint Venture
יצא לאור: (2023) -
Clarification on quotation and submission of BOQ without price for facade curtain, window, vertical louver works of BRAC University new campus project
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023) -
Clarification meeting regarding design issues of BRAC University new campus project
מאת: BUCG
יצא לאור: (2023)