Clarification on the architectural wall in substructure of BRAC University new campus project
This record consists of general correspondence regarding clarification on the architectural wall in substructure of BRAC University new campus project.
1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/20664 |
Ähnliche Einträge
-
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
von: BUCG-ABC Joint Venture
Veröffentlicht: (2023) -
Clarification on quotation and submission of BOQ without price for facade curtain, window, vertical louver works of BRAC University new campus project
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Clarification meeting regarding design issues of BRAC University new campus project
von: BUCG
Veröffentlicht: (2023)