Clarification on the architectural wall in substructure of BRAC University new campus project
This record consists of general correspondence regarding clarification on the architectural wall in substructure of BRAC University new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20664 |
مواد مشابهة
-
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Clarification on quotation and submission of BOQ without price for facade curtain, window, vertical louver works of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Clarification meeting regarding design issues of BRAC University new campus project
بواسطة: BUCG
منشور في: (2023)