The extension of erection period and increase in sum insured for BRAC university
This record consists of general correspondence regarding the extension of erection period and increase in sum insured for BRACU new campus project.
Tác giả chính: | Sadharan Bima Corporation |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20661 |
Những quyển sách tương tự
-
Request for extension of insurance period
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Request to separate completed temporary works from the CAR sum insured of BRAC University new campus project
Bằng: Brac University
Được phát hành: (2023) -
Request to separate completed temporary works from the CAR sum insured
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Extension of coverage period from 5th March, 2020 to 31st December, 2022
Bằng: Bangladesh General Insurance Company Ltd. (BGIC)
Được phát hành: (2023) -
Extension of coverage period from 5th March, 2020 to 31st December, 2022
Bằng: Bangladesh General Insurance Company Ltd. (BGIC)
Được phát hành: (2023)