The extension of erection period and increase in sum insured for BRAC university
This record consists of general correspondence regarding the extension of erection period and increase in sum insured for BRACU new campus project.
Yazar: | Sadharan Bima Corporation |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20661 |
Benzer Materyaller
-
Request for extension of insurance period
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Request to separate completed temporary works from the CAR sum insured of BRAC University new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Request to separate completed temporary works from the CAR sum insured
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Extension of coverage period from 5th March, 2020 to 31st December, 2022
Yazar:: Bangladesh General Insurance Company Ltd. (BGIC)
Baskı/Yayın Bilgisi: (2023) -
Extension of coverage period from 5th March, 2020 to 31st December, 2022
Yazar:: Bangladesh General Insurance Company Ltd. (BGIC)
Baskı/Yayın Bilgisi: (2023)