The extension of erection period and increase in sum insured for BRAC university
This record consists of general correspondence regarding the extension of erection period and increase in sum insured for BRACU new campus project.
Hoofdauteur: | Sadharan Bima Corporation |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20661 |
Gelijkaardige items
-
Request for extension of insurance period
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Request to separate completed temporary works from the CAR sum insured of BRAC University new campus project
door: Brac University
Gepubliceerd in: (2023) -
Request to separate completed temporary works from the CAR sum insured
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Extension of coverage period from 5th March, 2020 to 31st December, 2022
door: Bangladesh General Insurance Company Ltd. (BGIC)
Gepubliceerd in: (2023) -
Extension of coverage period from 5th March, 2020 to 31st December, 2022
door: Bangladesh General Insurance Company Ltd. (BGIC)
Gepubliceerd in: (2023)