M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020

This record consists of general correspondence regarding the M&E designs that are deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020 for BRACU new campus project.

التفاصيل البيبلوغرافية
المؤلف الرئيسي: BUCG
التنسيق: General correspondence
اللغة:English
منشور في: Brac University 2023
الموضوعات:
الوصول للمادة أونلاين:http://hdl.handle.net/10361/20655