M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
This record consists of general correspondence regarding the M&E designs that are deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020 for BRACU new campus project.
Päätekijä: | BUCG |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20655 |
Samankaltaisia teoksia
-
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of July 4, 2020
Tekijä: BUCG
Julkaistu: (2023) -
Design process of MDB & BMS system
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Comment from WOHA on conceptual drawing of swimming pool of BRAC University new campus project
Tekijä: Brac University
Julkaistu: (2023) -
Roof irrigation system drawing for playground & swimming pool
Tekijä: Electro-Mechanical Control Services (EMCS)
Julkaistu: (2023) -
Re: Outstanding design conditions as of 27 April, 2020
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023)