VO #034 Supply installation, testing & commissioning of ESE lighting protection system (rev.00)
This record consists of general correspondence regarding VO #034 supply installation, testing & commissioning of ESE lighting protection system (rev.00) of BRAC University new campus project.
Prif Awdur: | BUCG-ABC Joint Venture |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20640 |
Eitemau Tebyg
-
VO #034 Supply installation, testing & commissioning of lighting protection system (rev.01)
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023) -
VO#34 Supply, installation, testing & commissioning of lighting protection system
gan: Brac University
Cyhoeddwyd: (2023) -
VO.017-Approval of unit rate light protection connected to underground system
gan: Brac University
Cyhoeddwyd: (2023) -
Electrical lighting protection system
gan: WOHA Designs PTE LTD, et al.
Cyhoeddwyd: (2023) -
VO #017 Valuation of light protection connected to underground system of BRAC University new campus project
gan: Brac University
Cyhoeddwyd: (2023)