3rd request of extending suspension period arising from Covid-19 for BRACU project
This record consists of general correspondence regarding the 3rd request of extending suspension period arising from Covid-19 for BRACU new campus project.
Hoofdauteur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20638 |
Gelijkaardige items
-
Request to extend suspension period for BRACU project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Withdrawal of suspension of project work
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Re: Regarding withdrawal of suspension of project work
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Re: Regarding withdrawal of suspension of project work
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Request for suspension of work
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023)