VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
Tác giả chính: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20636 |
Những quyển sách tương tự
-
VO #024 Proposal of temporary beams being changed to permanent works
Bằng: BUCG-ABC Joint Venture
Được phát hành: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
Bằng: BUCG-ABC Joint Venture
Được phát hành: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Layout of capping beam of BRAC University new campus project
Bằng: WEB Structures
Được phát hành: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
Bằng: Brac University
Được phát hành: (2023)