VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
Главный автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20636 |
Схожие документы
-
VO #024 Proposal of temporary beams being changed to permanent works
по: BUCG-ABC Joint Venture
Опубликовано: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
по: BUCG-ABC Joint Venture
Опубликовано: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Layout of capping beam of BRAC University new campus project
по: WEB Structures
Опубликовано: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
по: Brac University
Опубликовано: (2023)