VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20636 |
Podobne zapisy
-
VO #024 Proposal of temporary beams being changed to permanent works
od: BUCG-ABC Joint Venture
Wydane: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
od: BUCG-ABC Joint Venture
Wydane: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Layout of capping beam of BRAC University new campus project
od: WEB Structures
Wydane: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
od: Brac University
Wydane: (2023)