VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
Hoofdauteur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20636 |
Gelijkaardige items
-
VO #024 Proposal of temporary beams being changed to permanent works
door: BUCG-ABC Joint Venture
Gepubliceerd in: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
door: BUCG-ABC Joint Venture
Gepubliceerd in: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Layout of capping beam of BRAC University new campus project
door: WEB Structures
Gepubliceerd in: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
door: Brac University
Gepubliceerd in: (2023)