VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
Autore principale: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20636 |
Documenti analoghi
-
VO #024 Proposal of temporary beams being changed to permanent works
di: BUCG-ABC Joint Venture
Pubblicazione: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
di: BUCG-ABC Joint Venture
Pubblicazione: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Layout of capping beam of BRAC University new campus project
di: WEB Structures
Pubblicazione: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
di: Brac University
Pubblicazione: (2023)