VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
मुख्य लेखक: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20636 |
समान संसाधन
-
VO #024 Proposal of temporary beams being changed to permanent works
द्वारा: BUCG-ABC Joint Venture
प्रकाशित: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
द्वारा: BUCG-ABC Joint Venture
प्रकाशित: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Layout of capping beam of BRAC University new campus project
द्वारा: WEB Structures
प्रकाशित: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
द्वारा: Brac University