VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
Auteur principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20636 |
Documents similaires
5th secondary beam layout plan part 4_Rev A
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023)
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023)
5th secondary beam layout plan part 1_Rev A
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023)
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023)
4th secondary beam layout plan part 1_Rev A
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023)
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023)
Documents similaires
-
VO #024 Proposal of temporary beams being changed to permanent works
par: BUCG-ABC Joint Venture
Publié: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
par: BUCG-ABC Joint Venture
Publié: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Layout of capping beam of BRAC University new campus project
par: WEB Structures
Publié: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
par: Brac University
Publié: (2023)