VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/20636 |
Similar Items
7th column and tie beam layout plan_Rev A
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023)
6th column and tie beam layout plan_Rev A
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023)
Similar Items
-
VO #024 Proposal of temporary beams being changed to permanent works
by: BUCG-ABC Joint Venture
Published: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
by: BUCG-ABC Joint Venture
Published: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Layout of capping beam of BRAC University new campus project
by: WEB Structures
Published: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
by: Brac University
Published: (2023)