VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
Hovedforfatter: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/20636 |
Lignende værker
5th secondary beam layout plan part 4_Rev A
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)
5th secondary beam layout plan part 1_Rev A
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)
4th secondary beam layout plan part 1_Rev A
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)
Lignende værker
-
VO #024 Proposal of temporary beams being changed to permanent works
af: BUCG-ABC Joint Venture
Udgivet: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
af: BUCG-ABC Joint Venture
Udgivet: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Layout of capping beam of BRAC University new campus project
af: WEB Structures
Udgivet: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
af: Brac University
Udgivet: (2023)