VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20636 |
Eitemau Tebyg
-
VO #024 Proposal of temporary beams being changed to permanent works
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Layout of capping beam of BRAC University new campus project
gan: WEB Structures
Cyhoeddwyd: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
gan: Brac University
Cyhoeddwyd: (2023)