VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
Hlavní autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/20636 |
Podobné jednotky
7th column and tie beam layout plan_Rev A
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023)
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023)
6th column and tie beam layout plan_Rev A
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023)
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023)
Podobné jednotky
-
VO #024 Proposal of temporary beams being changed to permanent works
Autor: BUCG-ABC Joint Venture
Vydáno: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
Autor: BUCG-ABC Joint Venture
Vydáno: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023) -
Layout of capping beam of BRAC University new campus project
Autor: WEB Structures
Vydáno: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
Autor: Brac University
Vydáno: (2023)