VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20636 |
مواد مشابهة
-
VO #024 Proposal of temporary beams being changed to permanent works
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Layout of capping beam of BRAC University new campus project
بواسطة: WEB Structures
منشور في: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023)