VO#024 Proposal of temporary beams being changed to permanent works rev.01
This record consists of general correspondence regarding the revised proposal of temporary beams being changed to permanent works of BRACU new campus project.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/20636 |
相似书籍
-
VO #024 Proposal of temporary beams being changed to permanent works
由: BUCG-ABC Joint Venture
出版: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
由: BUCG-ABC Joint Venture
出版: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Layout of capping beam of BRAC University new campus project
由: WEB Structures
出版: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
由: Brac University
出版: (2023)