Removing rebar without notice
This record consists of general correspondence regarding removing rebar without notice of Brac University new campus development project .
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/20631 |
相似书籍
-
Removal of rebar stacked at the west of the engineer office
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Resubmission of cutting hosting rebar of foundation piles
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Rebar welding at permanent caping in D-wall
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Valuation of rebar connection via mechanical coupler
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023)