Removing rebar without notice
This record consists of general correspondence regarding removing rebar without notice of Brac University new campus development project .
Tác giả chính: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20631 |
Những quyển sách tương tự
Những quyển sách tương tự
-
Removal of rebar stacked at the west of the engineer office
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Resubmission of cutting hosting rebar of foundation piles
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Rebar welding at permanent caping in D-wall
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Valuation of rebar connection via mechanical coupler
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023)