Removing rebar without notice
This record consists of general correspondence regarding removing rebar without notice of Brac University new campus development project .
Yazar: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20631 |
Benzer Materyaller
-
Removal of rebar stacked at the west of the engineer office
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Resubmission of cutting hosting rebar of foundation piles
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Rebar welding at permanent caping in D-wall
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Valuation of rebar connection via mechanical coupler
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023)