Removing rebar without notice
This record consists of general correspondence regarding removing rebar without notice of Brac University new campus development project .
第一著者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20631 |
類似資料
-
Removal of rebar stacked at the west of the engineer office
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Resubmission of cutting hosting rebar of foundation piles
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Rebar welding at permanent caping in D-wall
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Valuation of rebar connection via mechanical coupler
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023)