Removing rebar without notice
This record consists of general correspondence regarding removing rebar without notice of Brac University new campus development project .
Autore principale: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20631 |
Documenti analoghi
-
Removal of rebar stacked at the west of the engineer office
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Resubmission of cutting hosting rebar of foundation piles
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Rebar welding at permanent caping in D-wall
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Valuation of rebar connection via mechanical coupler
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023)