Removing rebar without notice
This record consists of general correspondence regarding removing rebar without notice of Brac University new campus development project .
Auteur principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20631 |
Documents similaires
-
Removal of rebar stacked at the west of the engineer office
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Resubmission of cutting hosting rebar of foundation piles
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Rebar welding at permanent caping in D-wall
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Valuation of rebar connection via mechanical coupler
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023)