Removing rebar without notice
This record consists of general correspondence regarding removing rebar without notice of Brac University new campus development project .
Κύριος συγγραφέας: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/20631 |
Παρόμοια τεκμήρια
-
Removal of rebar stacked at the west of the engineer office
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Resubmission of cutting hosting rebar of foundation piles
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Rebar welding at permanent caping in D-wall
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Valuation of rebar connection via mechanical coupler
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023)