Removing rebar without notice
This record consists of general correspondence regarding removing rebar without notice of Brac University new campus development project .
1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/20631 |
Ähnliche Einträge
-
Removal of rebar stacked at the west of the engineer office
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Resubmission of cutting hosting rebar of foundation piles
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Rebar welding at permanent caping in D-wall
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Valuation of rebar connection via mechanical coupler
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023)