Removing rebar without notice
This record consists of general correspondence regarding removing rebar without notice of Brac University new campus development project .
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20631 |
مواد مشابهة
-
Removal of rebar stacked at the west of the engineer office
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Resubmission of cutting hosting rebar of foundation piles
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Rebar welding at permanent caping in D-wall
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Valuation of rebar connection via mechanical coupler
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)