Re: Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub-clause 8.1 & 15.1
This record consists of general correspondence regarding the appointment of architectural coordinator according to the contract for BRACU new campus project.
Автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/20627 |
Схожі ресурси
-
Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub clause 8.1 & 15.1
за авторством: Brac University
Опубліковано: (2023) -
Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub-clause 8.1 & 15.1
за авторством: Brac University
Опубліковано: (2023) -
Coordination drawing of basement 1 storey (Architectural As Built Drawings)
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2024) -
The elements of coordinate geometry. part I, Cartesian coordinates. /
за авторством: Loney, S. L. (Sidney Luxton), 1860-1939
Опубліковано: (2003) -
Coordination drawing of 1st storey (Architectural As Built Drawings)
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2024)