Re: Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub-clause 8.1 & 15.1
This record consists of general correspondence regarding the appointment of architectural coordinator according to the contract for BRACU new campus project.
Egile nagusia: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formatua: | General correspondence |
Hizkuntza: | English |
Argitaratua: |
Brac University
2023
|
Gaiak: | |
Sarrera elektronikoa: | http://hdl.handle.net/10361/20627 |
Antzeko izenburuak
-
Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub clause 8.1 & 15.1
nork: Brac University
Argitaratua: (2023) -
Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub-clause 8.1 & 15.1
nork: Brac University
Argitaratua: (2023) -
Coordination drawing of basement 1 storey (Architectural As Built Drawings)
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2024) -
The elements of coordinate geometry. part I, Cartesian coordinates. /
nork: Loney, S. L. (Sidney Luxton), 1860-1939
Argitaratua: (2003) -
Coordination drawing of 1st storey (Architectural As Built Drawings)
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2024)