Re: Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub-clause 8.1 & 15.1
This record consists of general correspondence regarding the appointment of architectural coordinator according to the contract for BRACU new campus project.
1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/20627 |
Ähnliche Einträge
-
Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub clause 8.1 & 15.1
von: Brac University
Veröffentlicht: (2023) -
Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub-clause 8.1 & 15.1
von: Brac University
Veröffentlicht: (2023) -
Coordination drawing of basement 1 storey (Architectural As Built Drawings)
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2024) -
The elements of coordinate geometry. part I, Cartesian coordinates. /
von: Loney, S. L. (Sidney Luxton), 1860-1939
Veröffentlicht: (2003) -
Coordination drawing of 1st storey (Architectural As Built Drawings)
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2024)