Re: Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub-clause 8.1 & 15.1
This record consists of general correspondence regarding the appointment of architectural coordinator according to the contract for BRACU new campus project.
প্রধান লেখক: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
বিন্যাস: | General correspondence |
ভাষা: | English |
প্রকাশিত: |
Brac University
2023
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/20627 |
অনুরূপ উপাদানগুলি
-
Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub clause 8.1 & 15.1
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub-clause 8.1 & 15.1
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Coordination drawing of basement 1 storey (Architectural As Built Drawings)
অনুযায়ী: BUCG-ABC Joint Venture (BUCG-ABC JV)
প্রকাশিত: (2024) -
The elements of coordinate geometry. part I, Cartesian coordinates. /
অনুযায়ী: Loney, S. L. (Sidney Luxton), 1860-1939
প্রকাশিত: (2003) -
Coordination drawing of 1st storey (Architectural As Built Drawings)
অনুযায়ী: BUCG-ABC Joint Venture (BUCG-ABC JV)
প্রকাশিত: (2024)