Regarding transporting the steel structure of zone C outside of BRAC University new campus project
This record consists of general correspondence regarding transporting the steel structure of zone C outside of BRAC University new campus project.
Hoofdauteur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20619 |
Gelijkaardige items
-
Regarding transporting the steel structure of zone C outside the project
door: Brac University
Gepubliceerd in: (2023) -
Regarding acceptance of steel structure
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Cover page of steel structure as-built drawing of BRAC University New Campus Project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2024) -
Regarding confirming remaining steel structure materials of BRAC University new campus project
door: Brac University
Gepubliceerd in: (2023) -
Quantity details of the first and second batch of prefabricated steel structure of BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023)