Regarding transporting the steel structure of zone C outside of BRAC University new campus project
This record consists of general correspondence regarding transporting the steel structure of zone C outside of BRAC University new campus project.
Auteur principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20619 |
Documents similaires
-
Regarding transporting the steel structure of zone C outside the project
par: Brac University
Publié: (2023) -
Regarding acceptance of steel structure
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Cover page of steel structure as-built drawing of BRAC University New Campus Project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024) -
Regarding confirming remaining steel structure materials of BRAC University new campus project
par: Brac University
Publié: (2023) -
Quantity details of the first and second batch of prefabricated steel structure of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023)