Regarding transporting the steel structure of zone C outside of BRAC University new campus project
This record consists of general correspondence regarding transporting the steel structure of zone C outside of BRAC University new campus project.
Päätekijä: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20619 |
Samankaltaisia teoksia
-
Regarding transporting the steel structure of zone C outside the project
Tekijä: Brac University
Julkaistu: (2023) -
Regarding acceptance of steel structure
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Cover page of steel structure as-built drawing of BRAC University New Campus Project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2024) -
Regarding confirming remaining steel structure materials of BRAC University new campus project
Tekijä: Brac University
Julkaistu: (2023) -
Quantity details of the first and second batch of prefabricated steel structure of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023)