Other quotations of instrumentation and monitoring work by the third party
This record consists of general correspondence regarding the other quotations of instrumentation and monitoring work by the third party of Brac University new campus development project .
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20618 |
Podobne zapisy
-
Quotation of instrumentation and monitoring work
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Approval of instrumentation & monitoring works
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Re-instrumentation and monitoring
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Validation for instrumentation and monitoring works of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Verified valuation for instrumentation and monitoring works of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)