Documents for temporary substation
This record consists of general correspondence regarding the documents for temporary substation of Brac University new campus development project .
Príomhchruthaitheoir: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20617 |
Míreanna comhchosúla
-
Regarding the temporary substation (internal substation) of the project
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Request for final due payment for temporary substation work of BRAC University new campus project
de réir: B-Trac Engineering Ltd.
Foilsithe / Cruthaithe: (2023) -
Application for the refund of the temporary substation fee returned by DESCO
de réir: BUCG-ABC Joint Venture
Foilsithe / Cruthaithe: (2023) -
Rebuilding of temporary office by the contractor
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)