Documents for temporary substation
This record consists of general correspondence regarding the documents for temporary substation of Brac University new campus development project .
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20617 |
مواد مشابهة
-
Regarding the temporary substation (internal substation) of the project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Request for final due payment for temporary substation work of BRAC University new campus project
بواسطة: B-Trac Engineering Ltd.
منشور في: (2023) -
Application for the refund of the temporary substation fee returned by DESCO
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Rebuilding of temporary office by the contractor
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)