Request to open new work order for the steel structure work of BRAC University new campus project
This record consists of general correspondence regarding request to open new work order for the steel structure work of BRAC University new campus project.
Главный автор: | BUCG-ABC Joint Venture |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20612 |
Схожие документы
-
Steel structure work for catwalk & spiral stair
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Request to open the LC for structural steel work
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Purchase order for supply of pre-fabricated steel structure building
по: Brac University
Опубликовано: (2023) -
CIF cost breakdown for steel structure works of BRAC University new campus project
по: BUCG-ABC Joint Venture
Опубликовано: (2023)