Request for final due payment for temporary substation work of BRAC University new campus project
This record consists of general correspondence regarding request for final due payment for temporary substation work of BRAC University new campus project.
Príomhchruthaitheoir: | B-Trac Engineering Ltd. |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20603 |
Míreanna comhchosúla
-
Request for final due payment for temporary substation work
de réir: B-Trac Engineering Ltd.
Foilsithe / Cruthaithe: (2023) -
Regarding the temporary substation (internal substation) of the project
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Documents for temporary substation
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Instruction to start the work of substation at BRACU new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023)