V0#025 Proposal of steel Y-column core filling with chemical around 4th storey rev.01
This record consists of general correspondence regarding the revised proposal of steel Y-column core filling with chemical around 4th storey of BRACU new campus building.
Autore principale: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Natura: | General correspondence |
Lingua: | Spanish / Castilian |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20599 |
Documenti analoghi
-
V0#025 Proposal of steel Y-column core filling with chemical around 4th storey
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Beam slab wall column of 4th floor of BRAC University new campus project
di: WEB Structures
Pubblicazione: (2023) -
Coordination drawing of 4th storey (Architectural As Built Drawings)
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2024) -
Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B)
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
4th storey detail layout plan 5 of 6_Rev A
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023)