V0#025 Proposal of steel Y-column core filling with chemical around 4th storey rev.01
This record consists of general correspondence regarding the revised proposal of steel Y-column core filling with chemical around 4th storey of BRACU new campus building.
Hovedforfatter: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprog: | Spanish / Castilian |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/20599 |
Lignende værker
4th storey detail layout plan 6 of 6_ Rev A
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)
Lignende værker
-
V0#025 Proposal of steel Y-column core filling with chemical around 4th storey
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Beam slab wall column of 4th floor of BRAC University new campus project
af: WEB Structures
Udgivet: (2023) -
Coordination drawing of 4th storey (Architectural As Built Drawings)
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2024) -
Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B)
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
4th storey detail layout plan 5 of 6_Rev A
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)