V0#025 Proposal of steel Y-column core filling with chemical around 4th storey rev.01
This record consists of general correspondence regarding the revised proposal of steel Y-column core filling with chemical around 4th storey of BRACU new campus building.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | General correspondence |
Iaith: | Spanish / Castilian |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20599 |
Eitemau Tebyg
-
V0#025 Proposal of steel Y-column core filling with chemical around 4th storey
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Beam slab wall column of 4th floor of BRAC University new campus project
gan: WEB Structures
Cyhoeddwyd: (2023) -
Coordination drawing of 4th storey (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
4th storey detail layout plan 5 of 6_Rev A
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)